DocumentCode :
2109366
Title :
Parasitic crossing at an asymmetric B factory, APIARY
Author :
Chin, Y.H.
Author_Institution :
Accel. & Fusion Res. Div., Lawrence Berkeley Lab., CA, USA
fYear :
1991
fDate :
6-9 May 1991
Firstpage :
213
Abstract :
Effects of parasitic crossings (near-miss collisions of two counter-rotating beams at unwanted positions near the IP) are studied in terms of computer simulations for an asymmetric B-factory, APIARY-6.3d. Beams are separated horizontally at the first parasitic crossing points by about 7.6 times the horizontal RMS size of the low energy beam (the larger in size of the two beams). Simulations, including both the beam collision at the IP and parasitic crossings, have been performed for different separation distances.<>
Keywords :
beam handling techniques; physics computing; storage rings; APIARY; asymmetric B factory; computer simulations; counter-rotating beams; horizontal RMS size; low energy beam; near-miss collisions; parasitic crossings; separation distances; unwanted positions; Computational modeling; Computer simulation; Contracts; Government; Laboratories; Nuclear physics; Orbits; Particle beams; Production facilities; Protection;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1991. Accelerator Science and Technology., Conference Record of the 1991 IEEE
Conference_Location :
San Francisco, CA, USA
Print_ISBN :
0-7803-0135-8
Type :
conf
DOI :
10.1109/PAC.1991.164251
Filename :
164251
Link To Document :
بازگشت