DocumentCode
2109479
Title
The DZERO Level 3 DAQ System: Operation and Upgrades
Author
Garcia-Bellido, Aran ; Bose, Tulika ; Brooijmans, Gustaaf ; Chapin, Doug ; Cutts, David ; Fuess, Stuart ; Gadfort, Thomas ; Haas, Andrew ; Lee, William ; Rechenmacher, Ron ; Snyder, Scott ; Watts, Gordon ; Xie, Yunhe
Author_Institution
Washington Univ., Seattle
fYear
2007
fDate
April 29 2007-May 4 2007
Firstpage
1
Lastpage
5
Abstract
The D Level 3 data acquisition system for Run II of the Tevatron has been reliably operating since May 2002. Designed to handle average event sizes of 250 kilobytes at a rate of 1 kHz, the system has been upgraded to be able to process more events, doubling its typical output rate from 50 Hz to 100 Hz, while coping with higher event sizes at the beginning of high luminosity collider stores. The system routes and transfers event fragments from 63 VME crates to any of approximately 320 processing nodes. The addition of more farm nodes, the performance of the components, and the running experience are described here.
Keywords
data acquisition; high energy physics instrumentation computing; nuclear electronics; particle detectors; trigger circuits; DZERO Level 3 DAQ system; Tevatron Run II; data acquisition system; farm nodes; processing nodes; trigger systems; Data acquisition; Detectors; Ethernet networks; Event detection; Filters; Hardware; Laboratories; Physics; Routing; Switches;
fLanguage
English
Publisher
ieee
Conference_Titel
Real-Time Conference, 2007 15th IEEE-NPSS
Conference_Location
Batavia, IL
Print_ISBN
978-1-4244-0866-5
Electronic_ISBN
978-1-4244-0867-2
Type
conf
DOI
10.1109/RTC.2007.4382775
Filename
4382775
Link To Document