• DocumentCode
    2109479
  • Title

    The DZERO Level 3 DAQ System: Operation and Upgrades

  • Author

    Garcia-Bellido, Aran ; Bose, Tulika ; Brooijmans, Gustaaf ; Chapin, Doug ; Cutts, David ; Fuess, Stuart ; Gadfort, Thomas ; Haas, Andrew ; Lee, William ; Rechenmacher, Ron ; Snyder, Scott ; Watts, Gordon ; Xie, Yunhe

  • Author_Institution
    Washington Univ., Seattle
  • fYear
    2007
  • fDate
    April 29 2007-May 4 2007
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    The D Level 3 data acquisition system for Run II of the Tevatron has been reliably operating since May 2002. Designed to handle average event sizes of 250 kilobytes at a rate of 1 kHz, the system has been upgraded to be able to process more events, doubling its typical output rate from 50 Hz to 100 Hz, while coping with higher event sizes at the beginning of high luminosity collider stores. The system routes and transfers event fragments from 63 VME crates to any of approximately 320 processing nodes. The addition of more farm nodes, the performance of the components, and the running experience are described here.
  • Keywords
    data acquisition; high energy physics instrumentation computing; nuclear electronics; particle detectors; trigger circuits; DZERO Level 3 DAQ system; Tevatron Run II; data acquisition system; farm nodes; processing nodes; trigger systems; Data acquisition; Detectors; Ethernet networks; Event detection; Filters; Hardware; Laboratories; Physics; Routing; Switches;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Real-Time Conference, 2007 15th IEEE-NPSS
  • Conference_Location
    Batavia, IL
  • Print_ISBN
    978-1-4244-0866-5
  • Electronic_ISBN
    978-1-4244-0867-2
  • Type

    conf

  • DOI
    10.1109/RTC.2007.4382775
  • Filename
    4382775