DocumentCode
2111412
Title
Debunching and capture in the LEB for the SSC
Author
Mahale, N.K. ; Furman, Miguel A.
Author_Institution
Superconducting Supercollider Lab., Dallas, TX, USA
fYear
1991
fDate
6-9 May 1991
Firstpage
386
Abstract
Details of the capture process in the Low Energy Booster (LEB) for the SSC (Superconducting Super Collider) are presented. Only the longitudinal dynamics, are considered. Space charge forces are computed quasistatically. The beam pipe is considered to be perfectly conducting. With respect to maximizing the capture efficiency and minimizing the space charge tune spread, the initial few milliseconds are very important. The authors present only the first few milliseconds of the cycle, during which space charge effects are significant. For the numerical simulation, the ESME code is used.<>
Keywords
particle beam diagnostics; proton accelerators; synchrotrons; Low Energy Booster; SSC; Superconducting Super Collider; beam pipe; capture efficiency; longitudinal dynamics; space charge tune spread; Charge measurement; Current measurement; Jitter; Particle tracking; Propagation losses; Protons; Space charge; Voltage;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1991. Accelerator Science and Technology., Conference Record of the 1991 IEEE
Conference_Location
San Francisco, CA, USA
Print_ISBN
0-7803-0135-8
Type
conf
DOI
10.1109/PAC.1991.164310
Filename
164310
Link To Document