An Assembly Task Scheduling Method for Aircraft Development Project Based on Critical Chain
Author :
Zhang, Jie ; Li, Yuan ; Wang, Run-Xiao
Author_Institution :
Key Lab. of Contemporary Design & Integrated Manuf. Technol., Northwestern Polytech. Univ., Xi´´an, China
fYear :
2009
fDate :
20-22 Sept. 2009
Firstpage :
1
Lastpage :
4
Abstract :
Based on critical chain theory, a new method for aircraft development project was proposed on assembly task scheduling, which can effectively improve flexibility of assembly scheduling scheme. In the method, the priority rules for critical chain identification was established by the three characteristic parameters, and then the algorithm steps which identifies critical chain was listed by project network planning. Afterwards, a buffer setting method based on elasticity coefficient was utilized in improving flexibility of scheduling scheme, which can absorb duration fluctuation and avoid rescheduling situations. In addition, the application of the aircraft wing assembly was introduced, and the result demonstrated the functionality of the method.
Keywords :
aerospace components; aircraft manufacture; assembling; elasticity; project management; scheduling; aircraft development project; aircraft manufacturing; aircraft wing assembly; assembly task scheduling method; critical chain theory; elasticity coefficient; project network planning; Aircraft manufacture; Assembly; Educational technology; Elasticity; Fluctuations; Job shop scheduling; Laboratories; Manuals; Manufacturing; Uncertainty;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Management and Service Science, 2009. MASS '09. International Conference on
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-4638-4
Electronic_ISBN :
978-1-4244-4639-1
Type :
conf
DOI :
10.1109/ICMSS.2009.5302562
Filename :
5302562
Link To Document :
بازگشت