Title :
Optimal stochastic sequencing with earliness and/or tardiness costs
Author :
Pandelis, Dimitrios G. ; Teneketzis, Demosthenis
Author_Institution :
Dept. of Electr. Eng. & Comput. Sci., Michigan Univ., Ann Arbor, MI, USA
Abstract :
We consider a single- or multi-server facility where tasks belonging to N priority classes arrive for processing. Each task has a due date associated with its service completion. An earliness or tardiness penalty (depending on the task´s priority) is incurred if the task is completed at a time other than its due date. We characterize properties of dynamic nonidling nonpreemptive as well as dynamic nonidling preemptive scheduling strategies that minimize an infinite horizon expected discounted cost due to the earliness and tardiness penalties, and provide examples that illustrate these properties
Keywords :
operations research; optimisation; production control; queueing theory; stochastic processes; due date; dynamic nonidling preemptive scheduling; earliness cost; infinite horizon expected discounted cost; multiserver facility; optimal stochastic sequencing; production control; service completion; single-server facility; tardiness costs; tardiness penalty; Constraint optimization; Cost function; Dynamic scheduling; Infinite horizon; Job shop scheduling; Probability distribution; Processor scheduling; Production systems; Random variables; Stochastic processes;
Conference_Titel :
Decision and Control, 1993., Proceedings of the 32nd IEEE Conference on
Conference_Location :
San Antonio, TX
Print_ISBN :
0-7803-1298-8
DOI :
10.1109/CDC.1993.325895