    In this paper, design results of Three Gorges-Changzhou HVDC Project were summarized. The major features of this project were introduced. In specifying performance requirements, time special features of this project, conditions and requirements of both side AC systems as well as environment conditions and requirements were considered carefully. The most up to date technology of HVDC and computerized controls were followed. Efforts have been paid to promote development of HVDC technology and to minimize the cost of the project with the basis of ensuring security and stability of the AC/DC systems
  • Keywords
    HVDC power transmission; power system control; power system interconnection; power system security; power system stability; 500 kV; AC systems; AC/DC systems security; AC/DC systems stability; Three Gorges-Changzhou HVDC Project; computerized control; cost minimisation; environment conditions; performance requirements; AC generators; Analog-digital conversion; Costs; Frequency; HVDC transmission; Insulation; Integrated circuit interconnections; Power generation; Power system interconnection; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society Winter Meeting, 2000. IEEE
  • Print_ISBN
    0-7803-5935-6
  • Type

    conf

  • DOI
    10.1109/PESW.2000.849915
  • Filename
    849915