DocumentCode :
2115257
Title :
Assessment of Spillage of Large-scale Hydropower Plant Undertaking Spinning Reserve
Author :
Xu Chen-guang ; Zhao Mai-huan ; Zhang Xiang-Da
Author_Institution :
North China Inst. of Water Conservancy & Hydroelectric Power, Zhengzhou, China
fYear :
2010
fDate :
28-31 March 2010
Firstpage :
1
Lastpage :
4
Abstract :
Since the large-scale hydropower plant must undertake the spinning reserve of power system, a small amount of out-flow water does not generate electricity. In order to increase water use efficiency, it is necessary to calculate the spillage owing to improper dispatch. Therefore, the optimal operation of hydroelectric systems should be obligated with the undertaking spinning reserve. A calculation method of the spillage owing to improper dispatch for large-scale is discussed. And this method is used to calculate the spillage owing to improper dispatch of Longyangxia hydropower plant in 2001. The spillage owing to improper dispatch is remarkable, which could be saved by proper dispatch.
Keywords :
hydroelectric power stations; large-scale systems; optimisation; power generation dispatch; Longyangxia hydropower plant; hydroelectric systems; improper dispatch; large-scale hydropower plant; optimal operation; out-flow water; power system; spillage assessment; spinning reserve; water use efficiency; Hydroelectric power generation; Large-scale systems; Power generation; Power system dynamics; Power system planning; Power system security; Power system stability; Power systems; Spinning; Water conservation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power and Energy Engineering Conference (APPEEC), 2010 Asia-Pacific
Conference_Location :
Chengdu
Print_ISBN :
978-1-4244-4812-8
Electronic_ISBN :
978-1-4244-4813-5
Type :
conf
DOI :
10.1109/APPEEC.2010.5449313
Filename :
5449313
Link To Document :
بازگشت