DocumentCode :
2115274
Title :
Design and implementation of power market operation system for restructuring of KEPCO
Author :
Moon, Young-Hwan ; Lee, Hyo-Sang
Author_Institution :
Korea Electrotechnol. Res. Inst., Changwon, South Korea
Volume :
1
fYear :
2000
fDate :
2000
Firstpage :
34
Abstract :
Korea is now undergoing a restructuring process of the country´s electricity supply industry. The Korean electricity restructuring has the requirements to implement a competitive market structure and unbundle the existing vertically integrated utility, Korea Electric Power Corporation (KEPCO). KEPCO has selected a cost-based pool (CBP) as the starting point for the phased introduction of competition. In this paper, the introduction of the restructuring process of the power industry in Korea and design specifications of the power market operation system for the CBP phase in restructuring of KEPCO are described
Keywords :
commerce; electricity supply industry; power system interconnection; KEPCO restructuring; Korea; competition introduction; competitive market structure; cost-based power pool; design specifications; power industry; power market operation system; vertically integrated utility unbundling; Economic forecasting; Economic indicators; Electricity supply industry; Energy consumption; Fuel economy; Marketing and sales; Power generation; Power generation economics; Power industry; Power markets;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Engineering Society Winter Meeting, 2000. IEEE
Print_ISBN :
0-7803-5935-6
Type :
conf
DOI :
10.1109/PESW.2000.849922
Filename :
849922
Link To Document :
بازگشت