DocumentCode :
2115901
Title :
Optimization of the spare-part procure plan based on production plan in a steel pipe enterprise
Author :
Liu, Bo ; Dong, Shaohua ; Cheng, Xiangming
Author_Institution :
Sch. of Mech. Eng., Univ. of Sci. & Technol. Beijing, Beijing, China
fYear :
2012
fDate :
21-23 April 2012
Firstpage :
2735
Lastpage :
2738
Abstract :
In this paper, with the onsite research of the procure plan process in a steel pipe enterprise, a optimizing model is set for due date setting of purchase plan and reducing the cost, also a solution using Genetic Algorithms is offered.
Keywords :
cost reduction; genetic algorithms; maintenance engineering; pipes; procurement; production planning; purchasing; steel industry; cost reduction; due date setting; genetic algorithms; optimization; production planning; purchase planning; spare part procurement planning; steel pipe enterprise; Companies; Genetic algorithms; Genetics; Optimization; Procurement; Production; Steel; Genetic algorithm; Purchasing plan; Spare parts;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Consumer Electronics, Communications and Networks (CECNet), 2012 2nd International Conference on
Conference_Location :
Yichang
Print_ISBN :
978-1-4577-1414-6
Type :
conf
DOI :
10.1109/CECNet.2012.6201590
Filename :
6201590
Link To Document :
بازگشت