Study on Critical Path Method with Fixed Time Parameter in Network Planning Technology
Author
Jun-jie, Ma ; Jian-xun, Qi
Author_Institution
Sch. of Bus. Adm., North China Electr. Power Univ., Beijing, China
fYear
2010
fDate
24-26 Dec. 2010
Firstpage
166
Lastpage
170
Abstract
Critical path method is one core of network planning technology, which is one of the most important tool for project plan management. After applying the critical path method to the analysis of project planning, if the start time and finish time of some activities in network must be changed because of some cases, of course, the original network planning is influenced correspondingly. In view of this problem, on the basis of the critical path method, extending algorithm 1 and 2 of critical path method are proposed. Moreover, critical path method with fixed time parameter on the basis of above is given. When the start and finish time of arbitrary activities are changed, the degree of node and activity time parameter affected is proposed in quantity. It is feasible and correct to use through example.
Keywords
critical path analysis; network theory (graphs); project management; activity time parameter; critical path method; fixed time parameter; network planning technology; project plan management; Algorithm design and analysis; Biological system modeling; Operations research; Optimization; Power systems; Schedules; critical path method with fixed time parameter; network planning technology; project plan management; time parameter;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Science and Engineering (ISISE), 2010 International Symposium on
Conference_Location
Shanghai
ISSN
2160-1283
Print_ISBN
978-1-61284-428-2
Type
conf
DOI
10.1109/ISISE.2010.96
Filename
5945077
Link To Document