    Study on Critical Path Method with Fixed Time Parameter in Network Planning Technology

  • Author

    Jun-jie, Ma ; Jian-xun, Qi

  • Author_Institution
    Sch. of Bus. Adm., North China Electr. Power Univ., Beijing, China
  • fYear
    2010
  • fDate
    24-26 Dec. 2010
  • Firstpage
    166
  • Lastpage
    170
  • Abstract
    Critical path method is one core of network planning technology, which is one of the most important tool for project plan management. After applying the critical path method to the analysis of project planning, if the start time and finish time of some activities in network must be changed because of some cases, of course, the original network planning is influenced correspondingly. In view of this problem, on the basis of the critical path method, extending algorithm 1 and 2 of critical path method are proposed. Moreover, critical path method with fixed time parameter on the basis of above is given. When the start and finish time of arbitrary activities are changed, the degree of node and activity time parameter affected is proposed in quantity. It is feasible and correct to use through example.
  • Keywords
    critical path analysis; network theory (graphs); project management; activity time parameter; critical path method; fixed time parameter; network planning technology; project plan management; Algorithm design and analysis; Biological system modeling; Operations research; Optimization; Power systems; Schedules; critical path method with fixed time parameter; network planning technology; project plan management; time parameter;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Science and Engineering (ISISE), 2010 International Symposium on
  • Conference_Location
    Shanghai
  • ISSN
    2160-1283
  • Print_ISBN
    978-1-61284-428-2
  • Type

    conf

  • DOI
    10.1109/ISISE.2010.96
  • Filename
    5945077