    One New Method to Solve Time-Cost Tradeoff Problem

  • Author

    Dedong, Sun ; Jian-xun, Qi

  • Author_Institution
    Sch. of Bus. Adm., North China Electr. Power Univ., Beijing, China
  • fYear
    2010
  • fDate
    24-26 Dec. 2010
  • Firstpage
    567
  • Lastpage
    571
  • Abstract
    Time-cost tradeoff problem is one core problem in project scheduling, and also is one difficult problem which project manager have to face. Methods of solving the problem mainly contain method of network flow and method of mending the minimal cost. There into, for the method of mending the minimal cost are intuitionistic, convenient and lesser computation, these advantages make the method being used widely in practice. But disadvantage of the method is that the result of each step is optimal but the terminal result maybe not optimal. In this paper, method of reducing duration directly is designed on the basis of the method of mending the minimal cost, and the result of solving time-cost tradeoff problem is more optimized.
  • Keywords
    costing; scheduling; minimal cost; network flow; project manager; project scheduling; time-cost tradeoff problem; Computational modeling; Job shop scheduling; Planning; Power systems; Processor scheduling; Project management; float; network planning technology; optimal method; project scheduling; time-cost tradeoff problem;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Science and Engineering (ISISE), 2010 International Symposium on
  • Conference_Location
    Shanghai
  • ISSN
    2160-1283
  • Print_ISBN
    978-1-61284-428-2
  • Type

    conf

  • DOI
    10.1109/ISISE.2010.142
  • Filename
    5945170