• DocumentCode
    2123608
  • Title

    Implementation and tuning of the automatic generation control in the Energy National Control Center of Ecuador - CENACE

  • Author

    Narváez, Andrés

  • Author_Institution
    CENACE
  • fYear
    0
  • fDate
    0-0 0
  • Lastpage
    4
  • Abstract
    The automatic generation control - AGC has as the main objective keep the system frequency and the net interchange in the tie lines near to their scheduled values through generation set points in the units conditioned to this purpose. Consequently, the AGC implementation requires a careful process of tuning and testing of the remote control devices for generation units and the AGC program installed in the electric market administrator
  • Keywords
    SCADA systems; energy management systems; power generation control; power markets; telecontrol; Energy National Control Center; automatic generation control; electric market administrator; net interchange; remote control devices; system frequency; Automatic generation control; Automatic testing; Control systems; Frequency; Monitoring; Power generation; Power generation economics; Power system economics; Power system interconnection; Tuning; Automatic Generation Control; SCADA; implementation; testing; tuning;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Electronics and Control Applications, 2005. ICIECA 2005. International Conference on
  • Conference_Location
    Quito
  • Print_ISBN
    0-7803-9419-4
  • Type

    conf

  • DOI
    10.1109/ICIECA.2005.1644390
  • Filename
    1644390