DocumentCode
2123608
Title
Implementation and tuning of the automatic generation control in the Energy National Control Center of Ecuador - CENACE
Author
Narváez, Andrés
Author_Institution
CENACE
fYear
0
fDate
0-0 0
Lastpage
4
Abstract
The automatic generation control - AGC has as the main objective keep the system frequency and the net interchange in the tie lines near to their scheduled values through generation set points in the units conditioned to this purpose. Consequently, the AGC implementation requires a careful process of tuning and testing of the remote control devices for generation units and the AGC program installed in the electric market administrator
Keywords
SCADA systems; energy management systems; power generation control; power markets; telecontrol; Energy National Control Center; automatic generation control; electric market administrator; net interchange; remote control devices; system frequency; Automatic generation control; Automatic testing; Control systems; Frequency; Monitoring; Power generation; Power generation economics; Power system economics; Power system interconnection; Tuning; Automatic Generation Control; SCADA; implementation; testing; tuning;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Electronics and Control Applications, 2005. ICIECA 2005. International Conference on
Conference_Location
Quito
Print_ISBN
0-7803-9419-4
Type
conf
DOI
10.1109/ICIECA.2005.1644390
Filename
1644390
Link To Document