DocumentCode
2126281
Title
Initial operating experience with the auxiliary accelerating cavity for the TRIUMF cyclotron
Author
Laxdal, R.E. ; Fong, K. ; Mackenzie, G.H. ; Pacak, V. ; Pearson, J.B. ; Root, L. ; Zach, M.
Author_Institution
TRIUMF, Vancouver, BC, Canada
fYear
1991
fDate
6-9 May 1991
Firstpage
810
Abstract
A 92-MHz auxiliary accelerating cavity has been installed in the TRIUMF cyclotron. The cavity operates at the fourth harmonic of the main RF frequency with a planned peak voltage of 150 kV. At full power it will almost double the present energy gain per turn in the 400-500 MeV range, reducing by 25% the stripping loss of the H/sup -/ beam. Low-current beam tests have been conducted at voltages of up to 90 kV and a maximum voltage of 145 kV has been attained. The cavity has also been used to flattop the integrated energy gain per turn. A description of the cavity design and a summary of the operating experience are given.<>
Keywords
beam handling equipment; cavity resonators; ion accelerators; 150 kV; 400 to 500 MeV; 92 MHz; RF frequency; TRIUMF cyclotron; auxiliary accelerating cavity; design; fourth harmonic; integrated energy gain per turn; low current beam tests; operating experience; Acceleration; Automatic control; Control systems; Cyclotrons; Feedback; Frequency; Optical coupling; Radiofrequency amplifiers; Three-term control; Voltage;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1991. Accelerator Science and Technology., Conference Record of the 1991 IEEE
Conference_Location
San Francisco, CA, USA
Print_ISBN
0-7803-0135-8
Type
conf
DOI
10.1109/PAC.1991.164449
Filename
164449
Link To Document