• DocumentCode
    2129107
  • Title

    Total Requirements Control at Every Stage of Product Development

  • Author

    Kousik, S.R. ; Venkat, Raman

  • Author_Institution
    Philips Electron. India Ltd., Bangalore
  • fYear
    2007
  • fDate
    15-19 Oct. 2007
  • Firstpage
    337
  • Lastpage
    342
  • Abstract
    During the process of eliciting requirements, it is important to be aware and constantly focused on the classic triangle, i.e. people, process and technology. Losing focus on any one of them can lead to disastrous consequences especially in situations where the customer completely relies on the supplier for full product development. This paper discusses a model that is used to underpin the incoming requirements at every stage of development i.e. conceptualization, eliciting requirements, execution, and testing. The end result is a win-win relationship with the internal customer as well as the external customer.
  • Keywords
    formal specification; product development; program verification; software prototyping; post-release maintenance; product development; program conceptualization; program execution; program testing; requirements elicitation; requirements verification; total requirements control; Consumer electronics; Costs; DVD; Drives; Gears; Life testing; Performance evaluation; Product development; Prototypes; Stability;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Requirements Engineering Conference, 2007. RE '07. 15th IEEE International
  • Conference_Location
    Delhi
  • ISSN
    1090-705X
  • Print_ISBN
    978-0-7695-2935-6
  • Type

    conf

  • DOI
    10.1109/RE.2007.13
  • Filename
    4384200