Title :
The Analysis of Project Schedule Uncertainty: Based on Monte Carlo Simulation
Author :
Chen Qi-Wei ; Li Guo-Yin ; Zhuang Qing-Hui
Author_Institution :
Manage. Sci. & Eng. Dept., Wuhan Univ., Wuhan, China
fYear :
2009
fDate :
20-22 Sept. 2009
Firstpage :
1
Lastpage :
4
Abstract :
The method of Program Evaluation and Review Technique (PERT) has been applied to the field of project management extensively. However, traditional PERT is still defective when used in schedule control. According to the principles of PERT and the hypothesis that the activity duration in PERT obeys Beta distribution, this paper points out the disadvantages of traditional method in determining critical path in PERT network program, proposes the concept of "Critical Degree" to describe the importance degree of paths in PERT network, then puts forward Monte Carlo Simulation (MCS) to analyze project schedule uncertainty. The Example shows that MCS can overcome disadvantages of the traditional PERT method. At last, through the sensitivity analysis of each critical activity, this paper points out the critical activities that should be selectively controlled.
Keywords :
Monte Carlo methods; PERT; project management; sensitivity analysis; Monte Carlo simulation; PERT network program; beta distribution; program evaluation and review technique; project management; project schedule uncertainty analysis; sensitivity analysis; Costs; Electronic mail; Engineering management; Large-scale systems; Missiles; Monte Carlo methods; Project management; Random variables; Sensitivity analysis; Uncertainty;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Management and Service Science, 2009. MASS '09. International Conference on
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-4638-4
Electronic_ISBN :
978-1-4244-4639-1
Type :
conf
DOI :
10.1109/ICMSS.2009.5303138
Filename :
5303138
Link To Document :
بازگشت