Title :
First results of proton injection commissioning of the AGS booster synchrotron
Author :
Reece, R.K. ; Ahrens, L. ; Alessi, J. ; Bleser, E. ; Brennan, J.M. ; Luccio, A. ; Skelly, J. ; Soukas, A. ; van Asselt, W. ; Weng, W.T. ; Witkover, R.
Author_Institution :
Brookhaven Nat. Lab., Upton, NY, USA
Abstract :
Beam performance results for the injection phase of proton beam commissioning of the Alternating Gradient Synchrotron (AGS) booster synchrotron are presented. The beam from the 200 MeV LINAC is transported through a new beam line into the booster. This LINAC-to-booster (LTB) beam line includes a 126 degrees bend and brings the injected beam onto the Booster injection orbit through the backleg of a main-ring dipole magnet. Transfer of the beam from the LINAC to the booster, the spiralling beam, and closing of the orbit in the booster ring are discussed. Injection and transport through one sector of the ring were accomplished.<>
Keywords :
beam handling equipment; beam handling techniques; linear accelerators; proton accelerators; synchrotrons; AGS booster synchrotron; Alternating Gradient Synchrotron; LINAC-to-booster; beam line; main-ring dipole magnet; proton injection commissioning; spiralling beam; Coaxial cables; Extraterrestrial measurements; Instruments; Linear particle accelerator; Optical beams; Particle beam injection; Particle beams; Position measurement; Protons; Synchrotrons;
Conference_Titel :
Particle Accelerator Conference, 1991. Accelerator Science and Technology., Conference Record of the 1991 IEEE
Conference_Location :
San Francisco, CA, USA
Print_ISBN :
0-7803-0135-8
DOI :
10.1109/PAC.1991.164463