• DocumentCode
    2131078
  • Title

    Installation of the superconducting magnets in the HERA tunnel

  • Author

    Borchardt, I. ; Brauer, D. ; Chermenin, S. ; Degèle, D. ; Escherich, K. ; Fiebig, H.J. ; Grabe, H. ; Holz, J. ; Hubert, D. ; Kus, R. ; Leenen, M. ; Maywald, H. ; Peters, O. ; Petersen, B. ; Pieczora, K. ; Riemer, U. ; Sanok, Z. ; Schmüser, P. ; Schollmeie

  • Author_Institution
    DESY, Hamburg, Germany
  • fYear
    1991
  • fDate
    6-9 May 1991
  • Firstpage
    857
  • Abstract
    The arcs of the proton storage ring of HERA are equipped with superconducting magnets. The magnets are arranged in a regular FODO cell structure consisting of two quadrupoles and four dipoles. The cryostats of the dipoles and the quadrupoles have a length of 9.7 m and 4 m, respectively. There are 422 dipoles and 224 quadrupoles in the ring, including some special magnets. In addition, there are about 1500 superconducting correction elements. The sequence of installation is discussed. The manpower requirements and the installation speed are described. Project engineering and project management aspects are considered.<>
  • Keywords
    beam handling equipment; electron accelerators; proton accelerators; storage rings; superconducting magnets; FODO cell structure; HERA tunnel; cryostats; dipoles; installation speed; project engineering; project management; proton storage ring; quadrupoles; superconducting correction elements; superconducting magnets; Cryogenics; Helium; Magnetic field measurement; Protons; Quality control; Storage rings; Superconducting cables; Superconducting magnets; Testing; Vehicles;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1991. Accelerator Science and Technology., Conference Record of the 1991 IEEE
  • Conference_Location
    San Francisco, CA, USA
  • Print_ISBN
    0-7803-0135-8
  • Type

    conf

  • DOI
    10.1109/PAC.1991.164469
  • Filename
    164469