• DocumentCode
    2131242
  • Title

    Study on the Risk Management Mechanism of the Engineering Project during Decision-Making Stage

  • Author

    Chen Wei ; Tang Jincai

  • Author_Institution
    Sch. of Civil Eng. & Archit., Wuhan Univ. of Technol., WuHan, China
  • fYear
    2009
  • fDate
    20-22 Sept. 2009
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Without a scientific risk management mechanism at the stage of the engineering project decision-making, it is very difficult to change the result of projects only by strengthening the implementation management. This paper research the mechanism from four aspects: procedure subsystem, methods subsystem, suitable risk management organization subsystem, law or rule subsystem and the essential condition of the decision-making environment. A series of appraisal index system is constructed and the DEA model (C2R) is used to analysis the four engineering projects as case to testify the scientific risk management mechanism which would be benefit for reducing the risk and improving the engineering project investment effect.
  • Keywords
    construction industry; data envelopment analysis; decision making; project management; risk management; DEA model; decision-making stage; engineering project decision-making; engineering project investment; risk management mechanism; risk management organization subsystem; Appraisal; Civil engineering; Data envelopment analysis; Decision making; Engineering management; Environmental economics; Project management; Risk analysis; Risk management; System testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science, 2009. MASS '09. International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-4638-4
  • Electronic_ISBN
    978-1-4244-4639-1
  • Type

    conf

  • DOI
    10.1109/ICMSS.2009.5303197
  • Filename
    5303197