• DocumentCode
    2131513
  • Title

    Research on Work Breakdown Structure of IT Project

  • Author

    Feng JingChun ; Zhang Fujie ; Li Ming

  • Author_Institution
    Bus. Sch., HOHAI Univ., Nanjing, China
  • fYear
    2009
  • fDate
    20-22 Sept. 2009
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    Work breakdown structure of IT project is one basic part of IT project management. IT project valuation and price, IT project objective control, IT project procurement and IT project contract management are all connected with IT work breakdown structure. This paper studies IT work breakdown structure and the meaning of each level including IT project, monomial works, unit works, subsection works and subentry works by analyzing the purpose of IT work breakdown structure. Based on the research above, this paper makes a detailed research on the breakdown of monomial works including communication engineering, software development, system integration and Website construction, thus putting forward IT work breakdown structure and breakdown structure of the four monomial works mentioned above.
  • Keywords
    Web design; project management; software engineering; IT project; IT project contract management; IT project management; IT project objective control; IT project price; IT project procurement; IT project valuation; Website construction; communication engineering; monomial works; software development; subentry works; subsection works; system integration; unit works; work breakdown structure; Contracts; Cost accounting; Electric breakdown; Information technology; Packaging; Procurement; Programming; Project management; Scheduling; Systems engineering and theory;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science, 2009. MASS '09. International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-4638-4
  • Electronic_ISBN
    978-1-4244-4639-1
  • Type

    conf

  • DOI
    10.1109/ICMSS.2009.5303208
  • Filename
    5303208