DocumentCode
2132211
Title
The proposed injection system for an asymmetric B factory in the PEP tunnel
Author
Bloom, E. ; Bulos, F. ; Loew, G. ; Miller, R. ; Sukiennicki, B. ; Mattison, T. ; Barletta, W.
Author_Institution
SLAC, Stanford Univ., CA, USA
fYear
1991
fDate
6-9 May 1991
Firstpage
982
Abstract
The proposed asymmetric energy B factory to be built in the PEP (Positron-Electron Project) tunnel will require a highly effective and profuse source of low-emittance electron and positron bunches. The specifications and required parameters of the injection system are shown. The B factory will consist of two rings of equal size, a 9 GeV electron ring and a 3.1 GeV positron ring, each with 1658 bunches, and with total circulating currents of 1.5 and 2.1 A, respectively. As the luminosity lifetime of the collider is expected to be about 2 h, the injector should be capable of filling the rings in a small fraction of an hour. With some simple modifications, the SLC linac with its damping rings and positron source is ideally suited to fulfil this function effectively. The injector will consist of the first 19 sectors of the linac the two damping rings, and the positron source. The overall injection system is described.<>
Keywords
electron accelerators; linear accelerators; PEP tunnel; SLC linac; asymmetric energy B factory; damping rings; injector; luminosity lifetime; positron bunches; Contracts; Damping; Electrons; Filling; Linear particle accelerator; Magnetic separation; Particle beam injection; Particle beams; Positrons; Production facilities;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1991. Accelerator Science and Technology., Conference Record of the 1991 IEEE
Conference_Location
San Francisco, CA, USA
Print_ISBN
0-7803-0135-8
Type
conf
DOI
10.1109/PAC.1991.164511
Filename
164511
Link To Document