Title :
An effective method for large scale project planning with multiple fuzzy activity times
Author :
Tsujimura, Yasuhiro ; Chang, In Seong ; Gen, Mitsuo
Author_Institution :
Dept. of Ind. & Syst. Eng., Ashikaga Inst. of Technol., Japan
Abstract :
Presents a method for solving a project planning problem in which the opinions of experts greatly disagree in terms of each activity processing time. Here, the goal is to determine the fuzzy project completion time and the degree of criticality for each path in a project network. Triangular fuzzy numbers (TFNs) are used to represent activity times of experts. Pessimistic object plan is introduced with major TFNs and an optimistic project plan with minor TFNs. The approach is illustrated by using a combination of the existing composite and comparison methods to determine the fuzzy project completion time and the degree of criticality for each path
Keywords :
expert systems; fuzzy logic; project management; criticality; expert systems; fuzzy project completion time; large scale project planning; major TFNs; minor TFNs; multiple fuzzy activity times; pessimistic object plan; triangular fuzzy numbers; Fuzzy systems; Large-scale systems; Optimization methods; Path planning; Process planning; Project management; Random variables; Systems engineering and theory; Technology planning; Uncertainty;
Conference_Titel :
Fuzzy Systems, 1993., Second IEEE International Conference on
Conference_Location :
San Francisco, CA
Print_ISBN :
0-7803-0614-7
DOI :
10.1109/FUZZY.1993.327376