• DocumentCode
    2144355
  • Title

    Organizational Project Selection Based on Fuzzy Multi-Index Evaluation and BP Neural Network

  • Author

    Bai, Sijun ; Li, Suike ; Feng, Rong ; Guo, Yuntao

  • Author_Institution
    Sch. of Manage., Northwestern Polytech. Univ., Xi´´an, China
  • fYear
    2010
  • fDate
    24-26 Aug. 2010
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    Project selection is the key to organizational survival and development. Through surveys and interviews, the project evaluation index system is established from the fore aspects based on the Balanced Scorecard (BSC). Then the fuzzy multi-index evaluation method and the neural network theory are combined to create the BP neural network model of organizational project selection. Finally, the application process and effectiveness of the model are described and confirmed through some samples and a Matlab simulation example.
  • Keywords
    backpropagation; fuzzy set theory; neural nets; organisational aspects; project management; BP neural network; Matlab simulation; balanced scorecard; fuzzy multiindex evaluation; organizational development; organizational project selection; organizational survival; project evaluation index system; Artificial neural networks; Indexes; Mathematical model; Natural languages; Organizations; Project management; Training;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science (MASS), 2010 International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-5325-2
  • Electronic_ISBN
    978-1-4244-5326-9
  • Type

    conf

  • DOI
    10.1109/ICMSS.2010.5576020
  • Filename
    5576020