DocumentCode
2145223
Title
Comparison of Alternative Construction Project Transaction Method Costs
Author
Hong, Wei-Min ; Liu Hong-mei ; Liu Shu-qing ; Yuan Jian ; Wu Hong-jun
Author_Institution
Coll. of Civil Eng. & Archit., Nantong Univ., Nantong, China
fYear
2010
fDate
24-26 Aug. 2010
Firstpage
1
Lastpage
4
Abstract
Considering a dearth of comparing construction project transaction method, from the point of transaction costs, the overall construction project transaction costs is divided into ex ante transaction costs, construction costs, ex post transaction costs. A framework for comparing construction project transaction method is presented, and applied to a detailed analysis of the department of Taihu drainage area´s fist design-build pilot project. The results of the study provide a comprehensive understanding of how this new design-build transaction method affects project cost performance as compared to their traditional design-bid-build transaction method. Other owners can apply this framework to assess their own project transaction performance when employing alternative transaction methods.
Keywords
construction industry; costing; project management; Taihu drainage area; construction project transaction costs; construction project transaction method; design-bid-build transaction method; design-build transaction method; ex ante transaction costs; ex post transaction costs; Buildings; Civil engineering; Construction industry; Contracts; Organizations; Transportation; Water resources;
fLanguage
English
Publisher
ieee
Conference_Titel
Management and Service Science (MASS), 2010 International Conference on
Conference_Location
Wuhan
Print_ISBN
978-1-4244-5325-2
Electronic_ISBN
978-1-4244-5326-9
Type
conf
DOI
10.1109/ICMSS.2010.5576062
Filename
5576062
Link To Document