• DocumentCode
    2145223
  • Title

    Comparison of Alternative Construction Project Transaction Method Costs

  • Author

    Hong, Wei-Min ; Liu Hong-mei ; Liu Shu-qing ; Yuan Jian ; Wu Hong-jun

  • Author_Institution
    Coll. of Civil Eng. & Archit., Nantong Univ., Nantong, China
  • fYear
    2010
  • fDate
    24-26 Aug. 2010
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Considering a dearth of comparing construction project transaction method, from the point of transaction costs, the overall construction project transaction costs is divided into ex ante transaction costs, construction costs, ex post transaction costs. A framework for comparing construction project transaction method is presented, and applied to a detailed analysis of the department of Taihu drainage area´s fist design-build pilot project. The results of the study provide a comprehensive understanding of how this new design-build transaction method affects project cost performance as compared to their traditional design-bid-build transaction method. Other owners can apply this framework to assess their own project transaction performance when employing alternative transaction methods.
  • Keywords
    construction industry; costing; project management; Taihu drainage area; construction project transaction costs; construction project transaction method; design-bid-build transaction method; design-build transaction method; ex ante transaction costs; ex post transaction costs; Buildings; Civil engineering; Construction industry; Contracts; Organizations; Transportation; Water resources;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science (MASS), 2010 International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-5325-2
  • Electronic_ISBN
    978-1-4244-5326-9
  • Type

    conf

  • DOI
    10.1109/ICMSS.2010.5576062
  • Filename
    5576062