Title :
Comparison of Alternative Construction Project Transaction Method Costs
Author :
Hong, Wei-Min ; Liu Hong-mei ; Liu Shu-qing ; Yuan Jian ; Wu Hong-jun
Author_Institution :
Coll. of Civil Eng. & Archit., Nantong Univ., Nantong, China
Abstract :
Considering a dearth of comparing construction project transaction method, from the point of transaction costs, the overall construction project transaction costs is divided into ex ante transaction costs, construction costs, ex post transaction costs. A framework for comparing construction project transaction method is presented, and applied to a detailed analysis of the department of Taihu drainage area´s fist design-build pilot project. The results of the study provide a comprehensive understanding of how this new design-build transaction method affects project cost performance as compared to their traditional design-bid-build transaction method. Other owners can apply this framework to assess their own project transaction performance when employing alternative transaction methods.
Keywords :
construction industry; costing; project management; Taihu drainage area; construction project transaction costs; construction project transaction method; design-bid-build transaction method; design-build transaction method; ex ante transaction costs; ex post transaction costs; Buildings; Civil engineering; Construction industry; Contracts; Organizations; Transportation; Water resources;
Conference_Titel :
Management and Service Science (MASS), 2010 International Conference on
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-5325-2
Electronic_ISBN :
978-1-4244-5326-9
DOI :
10.1109/ICMSS.2010.5576062