    "Breach of Contract" under FIDIC Conditions of Contract for Civil Engineering Construction

  • Author

    Mao Yihua ; Li Qingcheng

  • Author_Institution
    Inst. of Constr. Manage., Zhejiang Univ., Hangzhou, China
  • fYear
    2010
  • fDate
    24-26 Aug. 2010
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    With the development of theory and practice of the international project claim management, the contractor carrying out the contract claims is no longer based solely on the contract agreement, but rather towards the combination of contractual and legal trends. In FIDIC Conditions of Contract for Civil Engineering Construction (Red Book, 1987 edition), there has a more comprehensive description and requirements of the rights of the employer, engineer and the contractor. So the specific acts of the parties involved the contract may result in "Breach of Contract" and trigger claims of time and cost. In this paper, according to a further analysis of a series of claim cases based on the Red Book we have studied the background of the contractual and legal of "Breach of Contract" in depth.
  • Keywords
    civil engineering; construction; contract law; contracts; project management; FIDIC conditions; Red Book; breach of contract; civil engineering construction; contract agreement; contract claims; contractor; employer; international project claim management; legal trends; Books; Civil engineering; Construction industry; Contracts; Delay; Law;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science (MASS), 2010 International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-5325-2
  • Electronic_ISBN
    978-1-4244-5326-9
  • Type

    conf

  • DOI
    10.1109/ICMSS.2010.5576080
  • Filename
    5576080