• DocumentCode
    2146207
  • Title

    Application of Grey System Theory in Peace Avenue Overpass Bridge Construction Linear Control

  • Author

    Hu Jun ; Liu Zhi-feng ; Xu Wen-sheng

  • Author_Institution
    Sch. of Civil Eng. & Mech., Huazhong Univ. of Sci. & Technol., Wuhan, China
  • fYear
    2009
  • fDate
    20-22 Sept. 2009
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Peace Avenue overpass bridge belong to large-span continuous rigid frame, the gray system theory prediction method has been applied to Peace Avenue overpass bridge construction linear control. The construction of pre-camber gray prediction model is established, and is verified at Peace Avenue overpass bridge linear control. Monitoring Practice shows that the gray system theory can be applied to large-span continuous rigid frame bridge construction linear control, and expose high theoretical significance and practical value.
  • Keywords
    bridges (structures); grey systems; predictive control; Peace Avenue overpass bridge; bridge construction linear control; grey prediction method; grey system theory; large-span continuous rigid frame; Bridges; Concrete; Control systems; Differential equations; Monitoring; Peace technology; Predictive models; Stress; Structural beams; Uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science, 2009. MASS '09. International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-4638-4
  • Electronic_ISBN
    978-1-4244-4639-1
  • Type

    conf

  • DOI
    10.1109/ICMSS.2009.5303747
  • Filename
    5303747