• DocumentCode
    2147205
  • Title

    Process Approach for Decoration Project Quality Control and Management

  • Author

    Xu, Qiwen ; Wu, Dongmei

  • Author_Institution
    Sch. of Art, Huaihai Inst. of Technol., Lianyungang, China
  • fYear
    2010
  • fDate
    24-26 Aug. 2010
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    This paper presents an issue of using process approach and project lifecycle to manage decoration project. It analyses the five steps such as primary decoration conceiving, technician and builder choosing and signing up contract, decoration work plan designing, material stocking and field constructing, finished product checking and accepting. By using process approach to the project flow control, the decoration project management validity and constructing quality could be ensured well.
  • Keywords
    product life cycle management; project management; decoration project; decoration work plan designing; field constructing; finished product checking; material stocking; process approach; project flow control; project lifecycle; project management; Construction industry; Materials; Organizations; Outsourcing; Process control; Project management; Quality control;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science (MASS), 2010 International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-5325-2
  • Electronic_ISBN
    978-1-4244-5326-9
  • Type

    conf

  • DOI
    10.1109/ICMSS.2010.5576143
  • Filename
    5576143