• DocumentCode
    2147475
  • Title

    Schema Matching Model of Build-Operate-Transfer Projects

  • Author

    Wu, Haixi ; Dai, Dashuang ; Liu, Ning

  • Author_Institution
    Sch. of Manage., Dalian Univ. of Technol., Dalian, China
  • fYear
    2010
  • fDate
    24-26 Aug. 2010
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    This paper formulates a schema matching model to analyze the model selection problem arising from pattern recognize and schema matching between infrastructures and different type build-operate-transfer (BOT) project. Through systematical review, an analysis of relevant literature and cases analysis yielded significant factors that would have a certain impact on the feasibility of any BOT project. These factors were classified into three relative categories forming the structure of the suggested project schema matching model. This model presents a new approach to evaluate the relationships between decisions factors related to a project financing model. The proposed approach to project feasibility evaluation aims to increase the decision maker´s ability to determine the factors which make the greatest contribution to the financing model to the BOT project at hand.
  • Keywords
    decision making; financial management; fuzzy set theory; government policies; project management; public administration; BOT project; build-operate-transfer project; cases analysis; decision maker; model selection problem; pattern recognition; project feasibility evaluation; project financing model; project schema matching model; Biological system modeling; Complexity theory; Construction industry; Government; Investments; Mathematical model; Pricing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science (MASS), 2010 International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-5325-2
  • Electronic_ISBN
    978-1-4244-5326-9
  • Type

    conf

  • DOI
    10.1109/ICMSS.2010.5576152
  • Filename
    5576152