DocumentCode :
2147475
Title :
Schema Matching Model of Build-Operate-Transfer Projects
Author :
Wu, Haixi ; Dai, Dashuang ; Liu, Ning
Author_Institution :
Sch. of Manage., Dalian Univ. of Technol., Dalian, China
fYear :
2010
fDate :
24-26 Aug. 2010
Firstpage :
1
Lastpage :
5
Abstract :
This paper formulates a schema matching model to analyze the model selection problem arising from pattern recognize and schema matching between infrastructures and different type build-operate-transfer (BOT) project. Through systematical review, an analysis of relevant literature and cases analysis yielded significant factors that would have a certain impact on the feasibility of any BOT project. These factors were classified into three relative categories forming the structure of the suggested project schema matching model. This model presents a new approach to evaluate the relationships between decisions factors related to a project financing model. The proposed approach to project feasibility evaluation aims to increase the decision maker´s ability to determine the factors which make the greatest contribution to the financing model to the BOT project at hand.
Keywords :
decision making; financial management; fuzzy set theory; government policies; project management; public administration; BOT project; build-operate-transfer project; cases analysis; decision maker; model selection problem; pattern recognition; project feasibility evaluation; project financing model; project schema matching model; Biological system modeling; Complexity theory; Construction industry; Government; Investments; Mathematical model; Pricing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Management and Service Science (MASS), 2010 International Conference on
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-5325-2
Electronic_ISBN :
978-1-4244-5326-9
Type :
conf
DOI :
10.1109/ICMSS.2010.5576152
Filename :
5576152
Link To Document :
بازگشت