DocumentCode
2154555
Title
The design and implementation of production water prediction system about coalbed methane (CBM) vertical well
Author
Peng, Chen ; Xiao-ming, Ni ; Xiang-hao, Wang
Author_Institution
Institute of Resources & Environment Henan Polytechnic University, Jiaozuo, China ,454000
fYear
2010
fDate
4-6 Dec. 2010
Firstpage
2436
Lastpage
2439
Abstract
The accurate prediction of Coalbed methane vertical well production water is an important guarantee for reasonable work and CBM high-production during the drainage gas recovery. Based on different logging response in different coal reservoir, using logging curve, original permeability of the coal reservoir is predicted. According to the rock mechanics and hydraulic fracturing, the permeability prediction model is built. The production water prediction can be done using the history matching in the area with drainage gas recovery data, while in the area without the data; the production water prediction model can be gained by the characteristics of pressure transmission. In the paper, the CBM vertical well production water prediction system is designed and implemented based on the C#. The system is of applied good prospect be used in the Panzhuang block of Qinshui basin.
Keywords
History; Permeability; Predictive models; Production; Reservoirs; Water; CBM; permeability; prediction System; production water;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Science and Engineering (ICISE), 2010 2nd International Conference on
Conference_Location
Hangzhou, China
Print_ISBN
978-1-4244-7616-9
Type
conf
DOI
10.1109/ICISE.2010.5691507
Filename
5691507
Link To Document