DocumentCode
2160014
Title
Research on capacity planning problem in MTO enterprises group
Author
Bo, Hong-guang ; Zhang, Shu-ran ; Liu, Xiao-bing
Author_Institution
Department of Enterprise Management, School of Management, Dalian University of Technology, 116024, China
fYear
2010
fDate
4-6 Dec. 2010
Firstpage
473
Lastpage
477
Abstract
A capacity planning problem is described in MTO operation environment for the enterprises group. The orders are accepted by the group and then are allocated to the enterprises for the maximum net revenue. Capacity planning problem is discussed. Order processing and allocating problems are discussed in the enterprises group. An capacity planning model is proposed. Batch production is considered. Then a mathematic model is presented to solve the problem. An application case is presented to testify the model with the algorithm of Genetic Algorithm.
Keywords
Biological system modeling; Capacity planning; Materials; Mathematical model; Resource management; Steel; Make-To-Order; batch production; capacity planning; enterprises group;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Science and Engineering (ICISE), 2010 2nd International Conference on
Conference_Location
Hangzhou, China
Print_ISBN
978-1-4244-7616-9
Type
conf
DOI
10.1109/ICISE.2010.5691708
Filename
5691708
Link To Document