DocumentCode
2160318
Title
Estimating whole life environmental cost of construction projects based on CS and GM
Author
Duan, Xiaochen ; Wang, Haohang ; Zhang, Hui ; Zhang, Xiaoping
Author_Institution
School of Economics and Management, Shijiazhuang Tiedao University, China
fYear
2010
fDate
4-6 Dec. 2010
Firstpage
5101
Lastpage
5104
Abstract
In this paper, environment protection investment measurement of construction projects are discussed, aiming at providing decision support for estimating accurately on environment protection investment of construction projects. An example of highway construction project is settled to study the measurement and analysis technique of the whole life environmental investment benefit. Admittedly, the CS (Cost-significant) and GM (Grey Model) (1, 1) are introduced. CS theory can largely simplify the estimating processes among the similar projects and locate the CS´s items of similar projects. GM(1,1) model is used to predict and has a higher accuracy when there are few historical statistics. This paper focuses on the whole life environmental investment estimate prediction technique from prophase of the construction projects to the disposal pay-back period.
Keywords
Biological system modeling; Buildings; Economics; Investments; Maintenance engineering; Presses; Road transportation; CS; GM(1,1); whole life environmental investment;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Science and Engineering (ICISE), 2010 2nd International Conference on
Conference_Location
Hangzhou, China
Print_ISBN
978-1-4244-7616-9
Type
conf
DOI
10.1109/ICISE.2010.5691720
Filename
5691720
Link To Document