DocumentCode
2161469
Title
The research of performance warning mechanism and deviation control in Earned Value Management
Author
Ge-di, Ji ; Qing, Chang
Author_Institution
School of Business and Administration, North China Electric Power University, Beijing, China
fYear
2010
fDate
4-6 Dec. 2010
Firstpage
6315
Lastpage
6318
Abstract
In application of Earned Value Management (EVM), compared with Planed Value (PV), there is always deviation in Earned Value (EV) or Actual Cost (AC). It is proved that correction project depending on deviation will increase unnecessary spending rather than profit. This paper aims at the effects of deviation of deferent task for project, and conducts an investigation into the warning mechanism and the method of deviation control for EVM.
Keywords
Educational institutions; Power systems; Project management; Deviation Control; Earned Value; Warning Mechanism;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Science and Engineering (ICISE), 2010 2nd International Conference on
Conference_Location
Hangzhou, China
Print_ISBN
978-1-4244-7616-9
Type
conf
DOI
10.1109/ICISE.2010.5691763
Filename
5691763
Link To Document