Title :
Integrated scheduling and power application functions for Hong Kong Electric Company´s new EMS project
Author :
Cheng, Paul ; Seng, George
Author_Institution :
Hong Kong Electr. Co. Ltd., Hong Kong
Volume :
2
fYear :
1997
fDate :
11-14 Nov 1997
Firstpage :
764
Abstract :
To meet the increasing demand for a good quality and economical electricity supply, speedy analysis of large amounts of real-time data of power systems and the development of new strategies for forward looking operation and planning are necessary. These major objectives require high performance in scheduling and power application functions. Hong Kong Electric´s (HEC) existing EMS and DMS have been used for more than 10 years. A new EMS/DMS supplied by Siemens are expected to be commissioned in late 1997. The new EMS project takes an integrated approach in linking all the above real time control and studying functions with the use of a common database. This paper describes the expected improvement on day to day operation and planning on these areas with reference to current practices and utilization of available tools in HEC from the user´s point of view
Keywords :
power system control; DMS; EMS; Hong Kong; electricity supply quality; power application functions; power systems; project; real-time control; scheduling;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Advances in Power System Control, Operation and Management, 1997. APSCOM-97. Fourth International Conference on (Conf. Publ. No. 450)
Print_ISBN :
0-85296-912-0
Type :
conf
DOI :
10.1049/cp:19971930
Filename :
724945
Link To Document :
بازگشت