DocumentCode
2161754
Title
The study of dispatching rules for spraying and drying processes scheduling in painting workshop
Author
Chang, Liu ; Wei, Peng ; Haibo, Shi
Author_Institution
Dept. of Automated Equip., CAS, Shenyang, China
Volume
2
fYear
2010
fDate
26-28 Feb. 2010
Firstpage
605
Lastpage
608
Abstract
Some novel two-step dispatching rules are proposed for the spraying-drying processes in the painting workshop in this paper. The spraying-drying processes are the bottleneck and in the majority in painting workshop, and its scheduling problem very complicated. The two two-step rules are designed for the spraying-drying processes in the painting workshop considering some specific objective. The relative performance of the existing rules and the proposed rules is discussed for the equipment utilization, the part waiting time and the completion rate. The results of the study indicate that the proposed rules perform better than the existing rules.
Keywords
dispatching; drying; job shop scheduling; painting; spraying; vehicles; dispatching rules; drying process; equipment utilization; painting workshop; process scheduling; spraying process; waiting time; dispatching rule; painting workshop; scheduling; two-step rule;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer and Automation Engineering (ICCAE), 2010 The 2nd International Conference on
Conference_Location
Singapore
Print_ISBN
978-1-4244-5585-0
Electronic_ISBN
978-1-4244-5586-7
Type
conf
DOI
10.1109/ICCAE.2010.5451687
Filename
5451687
Link To Document