• DocumentCode
    2162174
  • Title

    Simulation and stability of a crab cavity

  • Author

    Greenwald, Z. ; Greenwald, S. ; Rice, D.H.

  • Author_Institution
    Lab. of Nucl. Studies, Cornell Univ., Ithaca, NY, USA
  • fYear
    1991
  • fDate
    6-9 May 1991
  • Firstpage
    1857
  • Abstract
    A feasibility study of the stability of a superconducting crab cavity for a B Factory was carried out. The study was done for the two trapped modes: the longitudinal TM010 and transverse TE111. It was found that for both modes the voltage induced by the beam bunches will be less than +or-20 kV for the TM010 mode and +or-1 kV for the TE111. Using the ZAP code it is shown that a stable frequency regime for the TM010 mode can be found in which the worse growth time is eight times larger than the radiation damping time. For the TE111 mode the high energy ring is stable while the low energy ring will have to be stabilized by the feedback system.<>
  • Keywords
    beam handling equipment; electron accelerators; storage rings; B Factory; CESR; beam bunches; feedback system; high energy ring; longitudinal TM010; radiation damping time; stable frequency regime; superconducting crab cavity; transverse TE111; trapped modes; Acceleration; Fourier transforms; Laboratories; Niobium; Polarization; Production facilities; Radio frequency; Resonance; Stability; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1991. Accelerator Science and Technology., Conference Record of the 1991 IEEE
  • Conference_Location
    San Francisco, CA, USA
  • Print_ISBN
    0-7803-0135-8
  • Type

    conf

  • DOI
    10.1109/PAC.1991.164801
  • Filename
    164801