• DocumentCode
    2164175
  • Title

    Emergency control and restoration of power system under disturbance

  • Author

    Au, Yiu-Wing ; Yung, Kai-Man

  • Author_Institution
    China Light & Power Co. Ltd., Hong Kong
  • Volume
    2
  • fYear
    1997
  • fDate
    11-14 Nov 1997
  • Firstpage
    808
  • Abstract
    This paper discusses China Light and Power Company operating criteria and the generation reserve requirements of the interconnected system including Hong Kong Electric Company and Guangdong Electric Power Holding Company. Emergency actions in the areas of generation reserve application, under-frequency load shedding, under-frequency system decoupling scheme, voltage reduction, manual load shedding, controlled load shedding and blackstart are described. The power system simulator is used as a principal tool to train control engineers to take appropriate emergency actions during power system disturbance
  • Keywords
    power system control; China Light and Power Company; Guangdong Electric Power Holding Company; Hong Kong Electric Company; blackstart; controlled load shedding; emergency control; generation reserve application; generation reserve requirements; interconnected system; manual load shedding; operating criteria; power system disturbance; power system restoration; power system simulator; under-frequency load shedding; under-frequency system decoupling; voltage reduction;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Advances in Power System Control, Operation and Management, 1997. APSCOM-97. Fourth International Conference on (Conf. Publ. No. 450)
  • Print_ISBN
    0-85296-912-0
  • Type

    conf

  • DOI
    10.1049/cp:19971938
  • Filename
    724954