• DocumentCode
    2166788
  • Title

    Research on the Adjustment of Engineering Insurance Rate Based on AHP under the Condition of Unit Price Contract

  • Author

    Chen, Weike ; Yang, Baolan ; Zhang, Zhenshi

  • Author_Institution
    Sch. of Manage., Tianjin Univ. of Technol., Tianjin, China
  • fYear
    2010
  • fDate
    24-26 Aug. 2010
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Regarding the rate-making method of engineering insurance, there isn´t a uniform standard in the field of insurance for a long time. Although there is a trend to calculate the engineering insurance rate based on the method of risk coefficient adjustment recent years, it doesn´t consider the significance of the risk synthetically by combining project cost and doesn´t consider the risk control condition of the insurance policy holder adequately. In order to define the engineering insurance rate objectively, this paper will evaluate the risk with the AHP method and intensively consider the cognition and control on risk by contractors and project owners. This paper also proposes a method to determine the adjustment coefficient of engineering insurance rate based on AHP under the condition of unit price contract, and proves the feasibility of the method.
  • Keywords
    contracts; insurance; pricing; risk analysis; AHP method; engineering insurance rate; insurance policy holder; project cost; rate-making method; risk coefficient adjustment; risk control condition; unit price contract condition; Construction industry; Contracts; Hydroelectric power generation; Insurance; Loss measurement; Monitoring; Risk analysis;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science (MASS), 2010 International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-5325-2
  • Electronic_ISBN
    978-1-4244-5326-9
  • Type

    conf

  • DOI
    10.1109/ICMSS.2010.5576922
  • Filename
    5576922