DocumentCode :
2170123
Title :
Multiple cranes control with task deadlines and priority constraints
Author :
Barbarisi, Osvaldo ; Del Vecchio, Carmen ; Parisio, Alessandra
Author_Institution :
Dipt. di Ing., Univ. degli Studi del Sannio, Benevento, Italy
fYear :
2007
fDate :
2-5 July 2007
Firstpage :
2031
Lastpage :
2038
Abstract :
In this paper, we solve a multiple cranes scheduling problem; cranes sharing the same track are considered. Cranes can reach any location along the track performing loading or unloading operations. As cranes share the same track their movements are constrained to avoid over crossing; task deadlines and priorities are also considered. We propose a control oriented approach to this class of problems. We modeled crane movements with Petri Nets, obtaining a binary model. We then considered task constraints and formulated the general scheduling problem when the control objective is to minimize the total amount of time to accomplish the task list. Computational experiments show that our approach could be used as an on line scheduling in a working plant.
Keywords :
Petri nets; cranes; scheduling; Petri nets; binary model; control oriented approach; crane control; crane movement modeling; crane scheduling problem; general scheduling problem; online scheduling; priority constraints; task constraints; task deadlines; Cranes; Job shop scheduling; Linear programming; Loading; Petri nets; Tracking; Vectors;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Control Conference (ECC), 2007 European
Conference_Location :
Kos
Print_ISBN :
978-3-9524173-8-6
Type :
conf
Filename :
7068882
Link To Document :
بازگشت