DocumentCode
2170123
Title
Multiple cranes control with task deadlines and priority constraints
Author
Barbarisi, Osvaldo ; Del Vecchio, Carmen ; Parisio, Alessandra
Author_Institution
Dipt. di Ing., Univ. degli Studi del Sannio, Benevento, Italy
fYear
2007
fDate
2-5 July 2007
Firstpage
2031
Lastpage
2038
Abstract
In this paper, we solve a multiple cranes scheduling problem; cranes sharing the same track are considered. Cranes can reach any location along the track performing loading or unloading operations. As cranes share the same track their movements are constrained to avoid over crossing; task deadlines and priorities are also considered. We propose a control oriented approach to this class of problems. We modeled crane movements with Petri Nets, obtaining a binary model. We then considered task constraints and formulated the general scheduling problem when the control objective is to minimize the total amount of time to accomplish the task list. Computational experiments show that our approach could be used as an on line scheduling in a working plant.
Keywords
Petri nets; cranes; scheduling; Petri nets; binary model; control oriented approach; crane control; crane movement modeling; crane scheduling problem; general scheduling problem; online scheduling; priority constraints; task constraints; task deadlines; Cranes; Job shop scheduling; Linear programming; Loading; Petri nets; Tracking; Vectors;
fLanguage
English
Publisher
ieee
Conference_Titel
Control Conference (ECC), 2007 European
Conference_Location
Kos
Print_ISBN
978-3-9524173-8-6
Type
conf
Filename
7068882
Link To Document