• DocumentCode
    2171538
  • Title

    Implementation of BSC Performance Evaluation System in Power Generation Enterprises

  • Author

    Guo Yiwei ; Yu Zhongfu ; Feng Lijuan

  • Author_Institution
    Accounting Dept., North China Electr. Power Univ., Beijing, China
  • fYear
    2009
  • fDate
    20-22 Sept. 2009
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    Enterprises´ performance evaluation is a major topic in capital market, company finance and management accounting fields. The key to the study currently is how to better apply the theory to practice and how to enhance its depth and scope to meet new requirements that had arisen in practice continuously. This paper studied BSC performance evaluation system in power generation enterprises and illustrate how to apply BSC theory to construct and implement a performance evaluation index system in a large power generation enterprise.
  • Keywords
    corporate modelling; electric power generation; management accounting; performance evaluation; power system economics; BSC theory; capital market; company finance; management accounting; performance evaluation; power generation enterprises; Costs; Educational institutions; Energy management; Mesh generation; Performance analysis; Power generation; Power grids; Power system management; Power system protection; Thermal management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science, 2009. MASS '09. International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-4638-4
  • Electronic_ISBN
    978-1-4244-4639-1
  • Type

    conf

  • DOI
    10.1109/ICMSS.2009.5304691
  • Filename
    5304691