DocumentCode :
2175597
Title :
The refurbishment of a 60 MVAr hydrogen cooled synchronous compensator
Author :
Campbell, A.
Author_Institution :
GEC Alsthom Electr. Services Ltd., Rugby, UK
fYear :
1998
fDate :
35927
Firstpage :
42430
Lastpage :
42436
Abstract :
GEC Alsthom Electrical Services have been responsible, as the main contractor, for seven synchronous compensator projects. This paper reviews the renewal and uprating of synchronous compensator 6 (SC6) for the National Grid Company at Sundon Substation near Luton. The workscope encompassed a complete rewind of both stator and field windings and the uprating of the protection and control systems. The expertise gained by GEC Alsthom Electrical Services on previous projects resulted in this project being completed within 13 months compared to a previous best of 18 months
Keywords :
hydrogen; 60 MVAr; GEC Alsthom Electrical Services; Luton; National Grid Company; Sundon Substation; control systems; field windings; hydrogen cooled synchronous compensator; protection systems; refurbishment; stator rewind;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Refurbishment of Machines (Digest No. 1998/410), IEE Half-Day Colloquium on
Conference_Location :
London
Type :
conf
DOI :
10.1049/ic:19980575
Filename :
706914
Link To Document :
بازگشت