• DocumentCode
    2175597
  • Title

    The refurbishment of a 60 MVAr hydrogen cooled synchronous compensator

  • Author

    Campbell, A.

  • Author_Institution
    GEC Alsthom Electr. Services Ltd., Rugby, UK
  • fYear
    1998
  • fDate
    35927
  • Firstpage
    42430
  • Lastpage
    42436
  • Abstract
    GEC Alsthom Electrical Services have been responsible, as the main contractor, for seven synchronous compensator projects. This paper reviews the renewal and uprating of synchronous compensator 6 (SC6) for the National Grid Company at Sundon Substation near Luton. The workscope encompassed a complete rewind of both stator and field windings and the uprating of the protection and control systems. The expertise gained by GEC Alsthom Electrical Services on previous projects resulted in this project being completed within 13 months compared to a previous best of 18 months
  • Keywords
    hydrogen; 60 MVAr; GEC Alsthom Electrical Services; Luton; National Grid Company; Sundon Substation; control systems; field windings; hydrogen cooled synchronous compensator; protection systems; refurbishment; stator rewind;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Refurbishment of Machines (Digest No. 1998/410), IEE Half-Day Colloquium on
  • Conference_Location
    London
  • Type

    conf

  • DOI
    10.1049/ic:19980575
  • Filename
    706914