• DocumentCode
    2179635
  • Title

    Project Risk Analysis Based on VB Procedures

  • Author

    Jia, Hu ; Guo, Jiangfeng

  • Author_Institution
    Dept. of IE, Tianjin Univ., Tianjin, China
  • fYear
    2009
  • fDate
    20-22 Sept. 2009
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    In this paper, the study is how to make use of VB program for the project risk analysis. Program design is based on the idea of the principles of Monte Carlo. The key is the set-up of random variables and steps for realization.
  • Keywords
    Monte Carlo methods; Visual BASIC; production engineering computing; project management; risk management; Monte Carlo simulation; VB procedure; VB program; program design; project risk analysis; random variable; Analytical models; Decision making; Electronic mail; Mathematical model; Monte Carlo methods; Project management; Random variables; Risk analysis; Risk management; Stochastic processes;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science, 2009. MASS '09. International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-4638-4
  • Electronic_ISBN
    978-1-4244-4639-1
  • Type

    conf

  • DOI
    10.1109/ICMSS.2009.5304989
  • Filename
    5304989