DocumentCode :
2179915
Title :
Concurrent simulation and optimization models for mining planning
Author :
Fioroni, Marcelo Moretti ; Franzese, Luiz Augusto G ; Bianchi, Tales Jefferson ; Ezawa, Luiz ; Pinto, Luiz Ricardo ; De Miranda, Gilberto, Jr.
Author_Institution :
Paragon Tecnol., Sao Paulo, Brazil
fYear :
2008
fDate :
7-10 Dec. 2008
Firstpage :
759
Lastpage :
767
Abstract :
One of the most important challenges for mining engineers is to correctly analyze and generate short-term planning schedules, or simply month mining plan. The objective is to demonstrate how simulation and optimization models were combined, with simultaneous execution, in order to achieve a feasible, reliable and accurate solution for this problem. A tool based on Arena simulation software and Lingo was developed, tested and approved within VALE (former CVRD Brazil), with excellent results, presented in this paper.
Keywords :
mining; planning; simulation; Arena simulation software; Lingo; VALE; month mining plan; optimization models; short-term planning schedules; simulation models; Analytical models; Costs; Design optimization; Discrete event simulation; Floors; Iron; Ores; Read only memory; Reliability engineering; Software tools;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Simulation Conference, 2008. WSC 2008. Winter
Conference_Location :
Austin, TX
Print_ISBN :
978-1-4244-2707-9
Electronic_ISBN :
978-1-4244-2708-6
Type :
conf
DOI :
10.1109/WSC.2008.4736138
Filename :
4736138
Link To Document :
بازگشت