• DocumentCode
    2180844
  • Title

    The design and implementation of Ontario Hydro´s new energy management system

  • Author

    Pugh, I.G.

  • Author_Institution
    Ontario Hydro, Mississauga, Ont., Canada
  • fYear
    1991
  • fDate
    26-28 Jun 1991
  • Firstpage
    192
  • Lastpage
    197
  • Abstract
    The responsibility for the integrated operation of Ontario Hydro´s Bulk Electric System (BES) rests with the System Control Centre (SCC). In 1985, because of concerns relating to equipment obsolescence, space restrictions and site security, Ontario Hydro decided to build a new SCC located in Clarkson some 30 km west of Toronto. It became operational on schedule in December 1990. The author provides an overview of the high level user requirements for the new SCC, focusing on the data acquisition and computer system and the resulting impact that the user requirements had on the computer architecture for this energy management system. The author also provides a brief outline of the commissioning processes and operational experience during the first two months of operation
  • Keywords
    load management; power system computer control; Bulk Electric System; Clarkson; Ontario Hydro; System Control Centre; computer architecture; data acquisition; energy management system; operational experience;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Power System Monitoring and Control, 1991., Third International Conference on
  • Conference_Location
    London
  • Print_ISBN
    0-85296-511-7
  • Type

    conf

  • Filename
    151775