• DocumentCode
    2187075
  • Title

    Discrete event simulation aids new Lean Production System at Mimeo.com

  • Author

    Babin, Paul ; Agirbas, Gozde

  • Author_Institution
    Mimeo.com, Memphis, TN, USA
  • fYear
    2008
  • fDate
    7-10 Dec. 2008
  • Firstpage
    2928
  • Lastpage
    2928
  • Abstract
    Mimeo.com is employing several new Lean Production System concepts in its new expansion plant start-up. Building on several successful Discrete Event Simulations using ProModel, the company employed a new model to simulate the material flow in the new plant design. This case study illustrates how simulations can be used effectively to plan, analyze and communicate new concepts prior to deploying them in production.
  • Keywords
    discrete event simulation; production engineering computing; discrete event simulation; lean production system; material flow; plant design; Acquired immune deficiency syndrome; Analytical models; Buildings; Discrete event simulation; Lean production; USA Councils;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference, 2008. WSC 2008. Winter
  • Conference_Location
    Austin, TX
  • Print_ISBN
    978-1-4244-2707-9
  • Electronic_ISBN
    978-1-4244-2708-6
  • Type

    conf

  • DOI
    10.1109/WSC.2008.4736418
  • Filename
    4736418