DocumentCode :
2187336
Title :
Productivity evaluation of 56” pipe production unit
Author :
Mardani, Soheil ; Alkatheer, Mohammad
Author_Institution :
Simaron Pardaz Co., Tehran, Iran
fYear :
2008
fDate :
7-10 Dec. 2008
Firstpage :
2936
Lastpage :
2936
Abstract :
Simulation is not only used for future forecasting, it is also used to analyze the past. Ahwaz Pipe Mills is producing wide variety of diameter sizes (12" to 56") all capable of meeting a large diversity of customer requirements for gas/oil and water in past 30 years The basic process of pipe production is not complex. The steel sheets pass several press and welding machines to form a pipe. Due to the necessary buffers and inspection stages it becomes complex. One of the most important challenges at the plants are the downtimes of the equipment which requires the production system to be dynamic. According this uncertainty measuring the amount of time that the whole production line is idle is almost an impossible job. Applying simulation techniques at APM has been done with two main goals: Increase productivity and to use production resources more effectively & analyzing past production operations.
Keywords :
pipes; production management; productivity; sheet materials; steel industry; welding equipment; Ahwaz Pipe Mills; customer requirements; pipe production unit; production line; production resources; production system; productivity evaluation; steel sheets; welding machines; Analytical models; Inspection; Metalworking machines; Milling machines; Petroleum; Predictive models; Production; Productivity; Steel; Welding;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Simulation Conference, 2008. WSC 2008. Winter
Conference_Location :
Austin, TX
Print_ISBN :
978-1-4244-2707-9
Electronic_ISBN :
978-1-4244-2708-6
Type :
conf
DOI :
10.1109/WSC.2008.4736426
Filename :
4736426
Link To Document :
بازگشت