DocumentCode :
2189307
Title :
Maximization of Distributed Generation with consideration of Fuse-Recloser coordination
Author :
Sirisophonwattana, Sopit ; Chaitusaney, Surachai
Author_Institution :
Dept. of Electr. Eng., Chulalongkorn Univ., Bangkok, Thailand
fYear :
2011
fDate :
17-19 May 2011
Firstpage :
857
Lastpage :
860
Abstract :
Distributed Generation (DG) is more and more widely used in power system. However, the installation of DG increases the short circuit level and may affect the Fuse-Recloser coordination. As a result, it can bring about the reduction of system reliability. The impact depends on sizes, locations, and control modes of DG. Therefore, this paper presents a procedure to determine the maximum capacity of DG in order to maintain the Fuse-Recloser coordination. In addition, the comparison of system reliability with and without using the proposed maximum capacity of DG is presented via three reliability indices, i.e. SAIFI, SAIDI, and ENS. The performance of the proposed method is tested in the reliability test system RBTS bus 2.
Keywords :
distributed power generation; power distribution reliability; ENS; SAIDI; SAIFI; control modes; distributed generation; fuse-recloser coordination; power system; reliability indices; reliability test system RBTS bus 2; short circuit level; Fuses; Reliability; Distributed generation (DG); distribution system; fuse; protection miscoordination; recloser; reliability;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electrical Engineering/Electronics, Computer, Telecommunications and Information Technology (ECTI-CON), 2011 8th International Conference on
Conference_Location :
Khon Kaen
Print_ISBN :
978-1-4577-0425-3
Type :
conf
DOI :
10.1109/ECTICON.2011.5947975
Filename :
5947975
Link To Document :
بازگشت