DocumentCode :
2189498
Title :
Writing maximum gap constraints for part routing in manufacturing systems modelled as Petri nets
Author :
Giglio, Davide ; Minciardi, Riccardo
Author_Institution :
DIST, Universita di Genova, Italy
Volume :
3
fYear :
2001
fDate :
2001
Firstpage :
2341
Abstract :
Considers the problem of part routing within a manufacturing system, represented as a timed Petri net. On the basis of such a model, it is possible to write the constraints affecting the system behaviour. A scheme is proposed in which token assignment (i.e., part routing) decisions must fulfill maximum gap constraints, which limit the set of allowed routing decision sequences
Keywords :
Petri nets; decision theory; production control; dynamic scheduling problems; manufacturing systems; maximum gap constraints; part routing; routing decision sequences; timed Petri net; token assignment decisions; Automatic control; Control systems; Dynamic scheduling; Fires; Manufacturing systems; Petri nets; Raw materials; Routing; Strain control; Writing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Decision and Control, 2001. Proceedings of the 40th IEEE Conference on
Conference_Location :
Orlando, FL
Print_ISBN :
0-7803-7061-9
Type :
conf
DOI :
10.1109/.2001.980610
Filename :
980610
Link To Document :
بازگشت