• DocumentCode
    2190338
  • Title

    Decision-Making Model on Concession Term for BOT Project Based on Profitable Operational Period

  • Author

    Wu Xiao Ling ; Zhou Jing

  • Author_Institution
    Sch. of Manage. & Eng., Nanjing Univ., Nanjing, China
  • fYear
    2009
  • fDate
    20-22 Sept. 2009
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    It is necessary for the government to determine a profitable operational period according to the building cost for BOT project and transfer one part of profitable operational period as the concession term to the project company. On the basis of game theory, this paper proposes a model to describe the competition between the government and the project company. The optimal strategies for them are discussed respectively by solving the game model. The obtained results can provide them with a decision-making support for BOT project.
  • Keywords
    costing; decision making; game theory; government; organisational aspects; profitability; BOT project; building cost; concession term; decision-making model; game theory; government; profitable operational period; project company; Buildings; Costs; Decision making; Engineering management; Game theory; Government; Investments; Project management; Risk management; Road transportation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science, 2009. MASS '09. International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-4638-4
  • Electronic_ISBN
    978-1-4244-4639-1
  • Type

    conf

  • DOI
    10.1109/ICMSS.2009.5305368
  • Filename
    5305368