DocumentCode :
2194287
Title :
Anatomy of the blackout investigation
Author :
Thomas, R.J.
Author_Institution :
Cornell Univ., Ithaca, NY, USA
fYear :
2004
fDate :
6-10 June 2004
Abstract :
Summary form only given. When the blackout occurred on August 14, 2003 it was completely unexpected. On August 15, 2003 President Bush and Prime Minister Chretien established a Joint US-Canadian Power Outage Task Force to investigate cause and to make recommendations about how to avoid future occurrences. The task force created three working groups to perform the actual investigation. In this talk we report on the structure and activities of the Electric System Working group.
Keywords :
power system faults; power system reliability; Electric System Working group; Joint US-Canadian Power Outage Task Force; blackout investigation; Anatomy; Joints;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Engineering Society General Meeting, 2004. IEEE
Conference_Location :
Denver, CO
Print_ISBN :
0-7803-8465-2
Type :
conf
DOI :
10.1109/PES.2004.1372866
Filename :
1372866
Link To Document :
بازگشت