DocumentCode :
2196176
Title :
A survey of AGC structures in North American ISO/RTOs
fYear :
2004
fDate :
6-10 June 2004
Firstpage :
883
Abstract :
For years, many of the "power pools" such as PJM had hierarchical architectures for AGC while other parts of North America had individual company control area implementations. With emerging deregulation, some ISO/RTOs perform direct control (CAISO) and others direct generation owners to perform the closed loop control of the units (ERGOT). This panel presentation summarizes the AGC structures being used and planned for various ISO/RTOs. The following is typical of the information that are presented: CAISO, ERCOT, MISO, ISONE, PJM, NYISO.
Keywords :
closed loop systems; power generation control; power generation scheduling; power system control; AGC structures; CAISO; ERCOT; ISO; ISONE; MISO; NYISO; PJM; RTO; area generation control; closed loop control; company control area implementations; direct control;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Engineering Society General Meeting, 2004. IEEE
Conference_Location :
Denver, CO
Print_ISBN :
0-7803-8465-2
Type :
conf
DOI :
10.1109/PES.2004.1372947
Filename :
1372947
Link To Document :
بازگشت