• DocumentCode
    2196176
  • Title

    A survey of AGC structures in North American ISO/RTOs

  • fYear
    2004
  • fDate
    6-10 June 2004
  • Firstpage
    883
  • Abstract
    For years, many of the "power pools" such as PJM had hierarchical architectures for AGC while other parts of North America had individual company control area implementations. With emerging deregulation, some ISO/RTOs perform direct control (CAISO) and others direct generation owners to perform the closed loop control of the units (ERGOT). This panel presentation summarizes the AGC structures being used and planned for various ISO/RTOs. The following is typical of the information that are presented: CAISO, ERCOT, MISO, ISONE, PJM, NYISO.
  • Keywords
    closed loop systems; power generation control; power generation scheduling; power system control; AGC structures; CAISO; ERCOT; ISO; ISONE; MISO; NYISO; PJM; RTO; area generation control; closed loop control; company control area implementations; direct control;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society General Meeting, 2004. IEEE
  • Conference_Location
    Denver, CO
  • Print_ISBN
    0-7803-8465-2
  • Type

    conf

  • DOI
    10.1109/PES.2004.1372947
  • Filename
    1372947