Status of resynchronization of the two UCTE synchronous zones
Author
Feist, Jiri
fYear
2004
fDate
10-10 June 2004
Firstpage
1226
Abstract
This work presents resynchronization status of the two UCTE synchronous zones. With a view to a synchronous interconnection of the electricity networks to the UCTE system, as well as the rehabilitation of the interconnected operation, a comprehensive work has been done at the different bodies. UCTE and its TSO members covers all technical and organisational aspects of the reconnection of both UCTE zones. This work addresses the synchronisation cases of Bulgaria and Romania, Croatia and Bosnia-Herzegovina, Ukraine and Burhstyn Island with UCTE.
Keywords
power system interconnection; synchronisation; Bosnia-Herzegovina; Bulgaria; Burhstyn Island; Croatia; Romania; UCTE synchronous zones; Ukraine; electricity networks; interconnected operation rehabilitation; resynchronization; synchronous interconnection; Contracts; Electric variables measurement; Energy measurement; Europe; Power measurement; Power system interconnection; Power system measurements; Power transmission lines; Statistical analysis; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society General Meeting, 2004. IEEE
Conference_Location
Denver, CO
Print_ISBN
0-7803-8465-2
Type
conf
DOI
10.1109/PES.2004.1373050
Filename
1373050
Link To Document