• DocumentCode
    2198573
  • Title

    Status of resynchronization of the two UCTE synchronous zones

  • Author

    Feist, Jiri

  • fYear
    2004
  • fDate
    10-10 June 2004
  • Firstpage
    1226
  • Abstract
    This work presents resynchronization status of the two UCTE synchronous zones. With a view to a synchronous interconnection of the electricity networks to the UCTE system, as well as the rehabilitation of the interconnected operation, a comprehensive work has been done at the different bodies. UCTE and its TSO members covers all technical and organisational aspects of the reconnection of both UCTE zones. This work addresses the synchronisation cases of Bulgaria and Romania, Croatia and Bosnia-Herzegovina, Ukraine and Burhstyn Island with UCTE.
  • Keywords
    power system interconnection; synchronisation; Bosnia-Herzegovina; Bulgaria; Burhstyn Island; Croatia; Romania; UCTE synchronous zones; Ukraine; electricity networks; interconnected operation rehabilitation; resynchronization; synchronous interconnection; Contracts; Electric variables measurement; Energy measurement; Europe; Power measurement; Power system interconnection; Power system measurements; Power transmission lines; Statistical analysis; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society General Meeting, 2004. IEEE
  • Conference_Location
    Denver, CO
  • Print_ISBN
    0-7803-8465-2
  • Type

    conf

  • DOI
    10.1109/PES.2004.1373050
  • Filename
    1373050