DocumentCode :
2198573
Title :
Status of resynchronization of the two UCTE synchronous zones
Author :
Feist, Jiri
fYear :
2004
fDate :
10-10 June 2004
Firstpage :
1226
Abstract :
This work presents resynchronization status of the two UCTE synchronous zones. With a view to a synchronous interconnection of the electricity networks to the UCTE system, as well as the rehabilitation of the interconnected operation, a comprehensive work has been done at the different bodies. UCTE and its TSO members covers all technical and organisational aspects of the reconnection of both UCTE zones. This work addresses the synchronisation cases of Bulgaria and Romania, Croatia and Bosnia-Herzegovina, Ukraine and Burhstyn Island with UCTE.
Keywords :
power system interconnection; synchronisation; Bosnia-Herzegovina; Bulgaria; Burhstyn Island; Croatia; Romania; UCTE synchronous zones; Ukraine; electricity networks; interconnected operation rehabilitation; resynchronization; synchronous interconnection; Contracts; Electric variables measurement; Energy measurement; Europe; Power measurement; Power system interconnection; Power system measurements; Power transmission lines; Statistical analysis; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Engineering Society General Meeting, 2004. IEEE
Conference_Location :
Denver, CO
Print_ISBN :
0-7803-8465-2
Type :
conf
DOI :
10.1109/PES.2004.1373050
Filename :
1373050
Link To Document :
بازگشت